 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Sealcoat should be applied every 24-36 months to maximize asphalt protection. |
 |
 |
Temperatures prior to sealcoating should be 50 degrees and rising with no inclement weather. |
 |
 |
It takes 24-48 hours for sealcoat to cure correctly. |
 |
 |
Always rout cracks – it will increase sealant performance by 50%. |
 |
 |
Marking paint should never be cut with water. |
 |
 |
Do not sealcoat asphalt freshly paved surfaces for at least 6 months. |
 |
 |
Asphalt will soften in hot weather. Sharp, pointed objects (i.e. bicycle kickstands, high-heeled shoes, etc.) can damage the softened asphalt. |
 |
 |
Illinois state law allows only latex paint for parking lot and street markings. No Chlorinated Paints! |
 |
 |
Always inspect pavement for any major changes that may need immediate attention – cracks, holes, faded markings. |
 |
 |
Improper parking lot drainage can possibly be fixed with catch basin installation. |
|
|
|
|
|
 |
|